Clayton Bradley Upper School

Clayton Bradley Upper School

Clayton Bradley Upper School The new Upper School is a 31,000 SF gymnasium and classroom facility at the Clayton Bradley Stem Academy. The HVAC system consist of an applied VAV rooftop unit with VAV boxes, dedicated outside air unit with energy recovery, and rooftop...
Alcoa High School

Alcoa High School

Alcoa High School The new Alcoa High School is a 180,000 SF facility to replace the original facility initially built in 1939. The Owner desired to use a traditional water source heat pump loop with dedicated outside air units. These outside air units are connected to...