Park Vista Hotel
This project consisted of a re-design of the domestic hot water plant for the hotel with 300 guest rooms and 16 floors. The new hot plant was provided with higher efficiency boilers, new tanks and a redesigned piping system to replace the older system and reduce energy cost.
View gallery below.